I don’t think it’s a dumb idea, but it’s one of those choices that only looks smart if everything goes perfectly long term. Concrete doesn’t usually fail right away, it fails slowly, after seasons of settling, moisture movement, or a random stress you didn’t plan for.
What pushed me toward rebar on a small project was realizing how little control you actually have once it’s poured. You can do a great base, nail the mix, and still get one odd crack years later from something as simple as a wet season or nearby ground movement. Rebar doesn’t stop cracks entirely, but it keeps them from turning into structural headaches.
That said, I get why people skip it: cost, effort, and the feeling that an 8x8 pool isn’t exactly a bridge deck. If you’re already digging, forming, and pouring, though, adding a basic rebar layout is one of those “cheap insurance” steps. You’ll probably never notice the benefit, and that’s kind of the point.
If nothing else, think about future-you. Rebar is annoying once. Repairs are annoying forever.